Ella EW-SS-A-STD Guide d'installation Page 30

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 48
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 29
www.ellasbubbles.com Page 30 08/14
®
www.bciacrylic.com
62
INSTALLATION / WAINSCOTING
INSTALLATION / WAINSCOTING
TOOLS
o Tin Snips
o Tape Measure
o Straight Edge
o Orbital Jigsaw
o Sharpie
®
Marker
WAINSCOTING INSTALLATION
Step 1: Ask the customer how high up the wall they want the wainscoting to end. (Image A)
Tip:
Height cannot pass 59”.
A B C
Step 2: Draw a level horizontal line across the wall 1” below the desired location.
(Image B)
Tip:
If there is existing tile on the wall, and the top of the existing tile is level, you can use that as your horizontal line.
Step 3: Measure down from the horizontal line to the oor in 3 or 4 different locations. Add 1” to the measurements.
(Image C) Record the measurements.
Step 4: Draw a level vertical line from your horizontal line to the oor. Measure from the vertical line to one end of the wall in 3 or 4 different locations.
Record the measurements.
(Image D)
Step 5: Cut the panel, carefully supporting the panel with your other hand while keeping your ngers clear from the blade. Keep slip sheet on to prevent
any scrapes or scratches.
Step 6: Test t the panel, and make necessary adjustments.
Step 7: Prime along the border of the existing wall, staying
½” away from the edge. Place primer in vertical lines approximately 9” apart. (Image E)
Step 8: Allow primer to dry. Cover the primer with butyl tape and remove the release paper. Place silicone sealant between the lines in a “Z” pattern. (Image F)
D E F
Wainscoting
Vue de la page 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 47 48

Commentaires sur ces manuels

Pas de commentaire